Mayuri Tech Park, developed by Sri Mayuri Builders, is positioned along National Highway 16 in Mangalagiri, strategically placed within the Andhra Pradesh Capital Region—nestled between Vijayawada, Guntur, and Amaravati. With approximately 800,000 sq ft of built-up commercial space across a G+8 tower, it’s designed to accommodate around 8,000–10,000 professionals, marking it as one of AP’s largest standalone IT parks.
Its RERA‑registered, mixed-use schema offers office spaces ranging from ~2,400 sq ft to ~8,000 sq ft, with price points between ₹1.21 Cr and ₹4.04 Cr. Positioned 0.5 km from NRI Hospital and near major state infrastructure like AIIMS (3 km) and the Secretariat (10 km), its locality makes it a prime candidate for businesses and startups seeking regional access.
Mayuri Tech Park Facilities Info
Aspect | Details |
Address | NH‑16, NRI Exit, Mangalagiri Bypass, Mangalagiri, Andhra Pradesh 522503 |
Campus Size | ~3.7 acres, G+8 tower with ~800,000 sq ft built-up |
Unit Sizes & Pricing | 2,424–8,087 sq ft; ₹1.21 Cr–₹4.04 Cr |
Facilities | 24/7 power backup, high‑speed internet, CCTV security, fire sprinklers, lifts, central AC, covered parking, dry pantry, washrooms, reception & conference spaces |
Timing | Corporate hours (approx. 9 AM–7 PM Mon–Fri); 24/7 access in SEZ/IT zones |
Nearby Areas | NRI Hospital, AIIMS Amaravati, Guntur and Vijayawada cities, local retail and hospitality |
Transport Links | Frontage on NH-16; ~2.5 km to Mangalagiri Railway Station; APSRTC bus connectivity; Vijayawada Intl. Airport ~25 km |
Developer | Sri Mayuri Builders; RERA No. P07120050259 |
Status | Ready-to-move as of Jan 2023 |
Google Maps Location
Pros & Cons (Based on Listings & Public Feedback)
✅ Pros
- Scale & ambition: One of AP’s largest standalone IT buildings (~800k sq ft), capable of hosting 8–10k professionals.
- Modern amenities: High-speed internet, robust power backup, CCTV, fire safety, lifts, parking, AC, pantry, and conferencing — fully attuned to IT/SEZ needs.
- Strategic locale: Near healthcare (NRI Hospital, AIIMS), administrative hubs, rail, highway, and airport (25 km), anchoring its appeal.
- Climate & services: Users note stable power/water supply and pleasant local environment.
⚠️ Cons
- No metro: Lacks metro; primary transport via road and rail—APSRTC and highway access have to suffice.
- Early-stage feedback: Google reviews specific to the park are limited; much of the insight is from project listings rather than occupant reviews.
- Parking & traffic: Local traffic congestion and limited on-site parking may be drawbacks during peak hours.
In summary, Mayuri Tech Park stands as a flagship standalone IT tower in Andhra Pradesh’s tri-city region—Vijayawada, Guntur, Amaravati. With modern infrastructure, substantial space, and strategic proximity to major public and civic amenities, it offers excellent potential for regional and multi-city enterprises. Its location on NH‑16 with railway and airport connectivity compensates for the lack of metro access. While occupant-based feedback is still emerging, the project’s scale, amenities, and readiness for commercial operations make it a top-tier choice for tech firms, service providers, and startups aiming for critical mass and growth in the region.